September 28, 2013 Tahtakorpu dam and hydroelectric power plant of a total installed capacity of 31 MW was inaugurated. The ceremony was attended by Azerbaijani President Ilham Aliyev. INGOS Ltd. supplied complete 10 kV high voltage and low voltage electro equipment, and hydropower control system for this hydroelectric power project.
Copyright INGOS s.r.o., All rights reserved, | EnergoRea Division | Laboratory Instrument Division | Site map
Web Design - AiVision, s.r.o. - CMS AiPublisher