Respetamos la naturaleza
Homepage > EnergoRea > Referencias > References - Philippines

Philippines

Davao, hydroelectric power station, in progress

Design and delivery of the control system and complete MV and LV equipment for an output of 1 × 3030 kVA.

Timbaban, hydroelectric power station, in progress

Design and supply of power plant automation and complete HV, MV and LV equipment for an output of 3 × 7862 kVA.

FLS, hydroelectric power station, 2015

Design and delivery of the control and protection system, low-voltage and medium-voltage electrical equipment for an output of 2 × 2400 kVA.

In June 2015 the FLS hydropower plant in the Philippines was put into operation. INGOS was engaged in the construction as a supplier of electric part and provided electric power output station service systems, control system and electric protections. In the power plant two units are installed with Francis turbines and synchronous generators with a total output of 4800 kVA.

Cabulig, hydroelectric power station, 2015

Rehabilitation of the control system, complete low-voltage and medium-voltage electrical equipment after flood in 2014, for an output of 2 × 5700 kVA.

In June 2014 INGOS Ltd. signed a contract with Mindanao Energy Systems company for the reconstruction of electrical part of hydroelectric power plant Cabulig (2 x 5700 kVA) in the Philippines. The subject of the reconstruction is low and medium voltage electrical equipment, control system and electrical protections. The plant was damaged in floods and landslides in January 2014. The damaged equipment was removed in July, production completion and transport of new equipment are scheduled for August and September. Commissioning of reconstructed plant is expected to take place in November 2014.

     

Bubunawan, hydroelectric power station, 2014

Design and delivery of the control and protection system, low-voltage and medium-voltage electrical equipment for an output of 1 × 7300 kVA.

Cabulig, hydroelectric power station, 2012

Design and delivery of the control system, complete low-voltage and medium-voltage electrical equipment for an output of 2 × 5800 kVA.

Umiray, hydroelectric power station, 2012

Design and delivery of the control system, complete low-voltage and medium-voltage electrical equipment for an output of 1 × 1000 kVA.

San Luis, hydroelectric power station, 2010

Design and delivery of the control system and complete low-voltage electrical equipment for an output of 2 × 450 kVA.

Sevilla, hydroelectric power station, 2008

Design and delivery of the control system and complete low-voltage and high-voltage electrical equipment for an output of 2 × 1660 kVA Sevilla.