Respetamos la naturaleza
Homepage > EnergoRea > Referencias > References - Macedonia

Macedonia

Kalimanci, hydroelectric power station, 2019

Project, delivery and installation of HPP control system (PLC + SCADA), it is about complete renovation of the existing control and visualization system.

Pena, hydroelectric power station, 2019

Project, delivery and installation of HPP control system (PLC + SCADA), it is about complete renovation of the existing control and visualization system.

Zrnovci, hydroelectric power station, 2009

Design and delivery of the control system and complete low-voltage electrical equipment for an output of 2 × 1100 kVA.

Matka, hydroelectric power station, 2008

Design and delivery of the control system and complete low-voltage electrical equipment for an output of 2 × 6000 kVA.

Dosnica, hydroelectric power station, 2008

Design and delivery of the control system and complete low-voltage electrical equipment for an output of 2 × 2200 kVA.

Sapuncica, hydroelectric power station, 2008

Design and delivery of the control system and complete low-voltage electrical equipment for an output of 2 × 1600 kVA.

Pesocani, hydroelectric power station, 2008

Design and delivery of the control system and complete low-voltage electrical equipment for an output of 2 × 1600 kVA.

 

 

Pena, hydroelectric power station, 2007

Design and delivery of the control system and complete low-voltage electrical equipment for an output of 2 × 1600 kVA.

Kalimanci, hydroelectric power station, 2006

Design and delivery of the control system and complete low-voltage and high-voltage electro-technological equipment for an output of 2 × 7500 kVA.