Design and delivery of the control and protection system and complete low-voltage electrical equipment for an output of 3 × 4122 kVA.
Design and delivery of the control and protection system and complete low-voltage electrical equipment for an output of 2 × 8545 kVA
On September 6, 2015 implementation of the control system and electric protections of hydropower plant was launched in Pakkat in Indonesia. After commissioning, which is scheduled for the end of 2015 the power station will have total output of 25 MVA and will become an important supplier of electric power in the remote inland area of the Sumatra Island.
Design and delivery of the control and protection system, low-voltage electrical equipment for an output of 2 × 2770 kVA.
Design and delivery of the control and protection system, low-voltage electrical equipment for an output of 2 × 6540 kVA.
Delivery of the control system hydro power plant for an output of 1 × 1800 kVA.
Delivery of the control system hydro power plant for an output of 2 × 1540 kVA.
Copyright Ingos Ltda, Todos los derechos reservados | División EnergoRea | Instrumentos de laboratorio | El mapa de las páginas
Sistema de redacción AIVision Ltda.