Design and delivery of control system and LV and MV electrical equipment after reconstruction of generator and turbine TG3 with output 46 MVA.
Design and delivery of control system and LV and MV electrical equipment after reconstruction of generator and turbine TG2 with output 25 MVA.
Design and delivery of unit control system for an output of 3 x 13.2 MVA.
Design and supply of power plant automation and complete LV and MV equipment for an output of 3 × 3131 kVA.
Design and delivery of control system and LV electrical equipment after reconstruction of generator and turbine TG2 with output 13.75 MVA.
Design and delivery of control system and LV and MV electrical equipment after reconstruction of generator and turbine TG2 with output 18.75 MVA, total power of 4 × 18.75 MVA.
Design and delivery of the control system for water intake for unit TG1 with an output of 3750 kVA.
Design and delivery of the control system of unit TG2 for an output of 1 × 46 MVA.
Design and delivery of the control and protection system of unit TG1 for an output of 1 × 46 MVA.
Design and delivery of the control and protection system, and low-voltage electrical equipment for the TG4 unit with an output of 1 x 13.75 MVA.
Design and delivery of the control and protection system, low-voltage, medium-voltage and high-voltage electrical equipment for an output of 1 x 13 MVA.
Delivery of control system including digital turbine governor for a unit with an output of 18 MVA.
Design and delivery of the control system of unit TG1 for an output of 1 × 15.9 MVA.
Copyright Ingos Ltda, Todos los derechos reservados | División EnergoRea | Instrumentos de laboratorio | El mapa de las páginas
Sistema de redacción AIVision Ltda.