Georia

Lajanuri TG3, hydroelectric power station, in progress 

Design and delivery of control system and LV and MV electrical equipment after reconstruction of generator and turbine TG3 with output 46 MVA.

Dzevrula TG2, hydroelectric power station, in progress

Design and delivery of control system and LV and MV electrical equipment after reconstruction of generator and turbine TG2 with output 25 MVA.

Shaori TG1, TG2, TG3, hydroelectric power station, in progress

Design and delivery of unit control system for an output of 3 x 13.2 MVA.

Skhalta, hydroelectric power station, 2020

Design and supply of power plant automation and complete LV and MV equipment for an output of 3 × 3131 kVA.

Gumati TG2, hydroelectric power station, 2019

Design and delivery of control system and LV electrical equipment after reconstruction of generator and turbine TG2 with output 13.75 MVA.

Rioni TG2, hydroelectric power station, 2019

Design and delivery of control system and LV and MV electrical equipment after reconstruction of generator and turbine TG2 with output 18.75 MVA, total power of 4 × 18.75 MVA.

Chkhorotsku, hydroelectric power station, 2019

Design and delivery of the control system for water intake for unit TG1 with an output of 3750 kVA.

Lajanuri, hydroelectric power station, 2017

Design and delivery of the control system of unit TG2 for an output of 1 × 46 MVA.

Lajanuri, hydroelectric power station, 2016

Design and delivery of the control and protection system of unit TG1 for an output of 1 × 46 MVA.

Gumati TG4, hydroelectric power station, 2016

Design and delivery of the control and protection system, and low-voltage electrical equipment  for the TG4 unit with an output of 1 x 13.75 MVA.

Atsi, hydroelectric power station, 2016

Design and delivery of the control and protection system, low-voltage, medium-voltage and high-voltage electrical equipment for an output of 1 x 13 MVA.

Rioni TG4, hydroelectric power station, 2014

Delivery of control system including digital turbine governor for a unit with an output of 18 MVA.

Gumati TG1, hydroelectric power station, 2012

Design and delivery of the control system of unit TG1 for an output of 1 × 15.9 MVA.