In June 2016, Shirataki hydroelectric power plant, located on Japan's most northern island Hokkaido was successfully commissioned and handed over to the end user.
The plant has one machine set - Kaplan turbine with asynchronous generator with an output of 316 kVA. The technological part of the plant was a turnkey delivery and our company supplied the control system, electrical protection system, the system's home consumption and 6,3kV equipment for the power output of the generator.
Copyright INGOS s.r.o., Все права защищены | Отдел EnergoRea | Отдел Лабораторное оборудование | Карта сайта
Разработка сайта - CMS - AiVision, s.r.o.