Проектирование, производство, продажа, обслуживание
Уважаем природу
Homepage > EnergoRea > Новости

Corani Hydroelectric Power Plant, Bolivia

31.05.2016
In April 2016 a contract for upgrade the hydroelectric power plant Corani in Bolivia was signed...

In April 2016 a contract for upgrade the hydroelectric power plant Corani in Bolivia was signed. This is a turnkey project consisting of the extension of the existing hydropower plant with four units for fifth 18MVA unit.

The part of the contract is an extension of the existing machine hall, construction of a new outlet channel and connection of the water inlet pipe to the existing pair of penstocks, including anchorage blocks and penstock valves.

Part of delivery is a complete  electro - mechanical part of the new unit - Pelton turbine, horizontal generator, penstock valves, HV feeder for connection to the existing 115kV substation, transformer 18MVA, 10kV switchgear for generator feeder and own consumption, low-voltage switchgear for main and backup power supply, control system, electric protection system and generator excitation system. The civil construction part will be realized by our Bolivian partner.